Station d’épuration Ginestous

Station d’épuration Ginestous

Date
Février 2019

Place
France

Location
Toulouse – France

Construction period
5 mois

Services
Tours HD 320

Project owner
Toulouse Métropole

Customer
SOGEA Hydraulique

We studied numerous shoring solutions that highlighted all our know-how.

Our solutions for building shoring (housing) on island B have been used with STAFLEX towers, steel props, Easy UP aluminium props; these allow high height shoring, with high load recovery, while being easier to handle (weight minimized by aluminium) and to use.

A team of more than 20 Altrad Formwork assemblers& Etaiement ensured the assembly and rotation of the material with 5-metre STAFLEX towers and H10 beams for maximum safety thanks to an ergonomic platform that prevents any risk of falling from a height.

 

H10 beam
aluminium props
semi-trailers

Retour